IMIS

Publicaties | Instituten | Personen | Datasets | Projecten | Kaarten | Infrastructuur
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

A combined supply chain optimisation model for the installation phase of offshore wind projects
Irawan, C.A.; Akbari, N.; Jones, D.F.; Menachof, D. (2018). A combined supply chain optimisation model for the installation phase of offshore wind projects. International Journal of Production Research 56(3): 1189-1207. https://dx.doi.org/10.1080/00207543.2017.1403661
In: International Journal of Production Research. TAYLOR & FRANCIS LTD: Abingdon. ISSN 0020-7543; e-ISSN 1366-588X, meer
Peer reviewed article  

Beschikbaar in  Auteurs 

Trefwoord
    Marien/Kust
Author keywords
    supply chain optimisation; port selection; logistics; renewable energy;offshore wind farm

Auteurs  Top 
  • Irawan, C.A.
  • Akbari, N.
  • Jones, D.F.
  • Menachof, D.

Abstract
    This paper proposes a combined model for port selection and supply chain optimisation for the installation phase of an offshore wind farm. Two strategic models are proposed where the first model, based on Analytical Hierarchy Process (AHP), aims to select the most suitable installation port. The second model is developed using Integer Linear Programming (ILP) in order to determine the optimal transportation schedule of the components from suppliers to the chosen installation port. The proposed models are evaluated for the West Gabbard (UK) offshore wind farm located in southern part of the North Sea. According to the computational results, the AHP model chooses port of Oostende, Belgium as the most suitable installation port for this offshore wind farm whereas the proposed supply chain model shows that the total transportation cost makes up 9% of total supply chain cost.

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs