Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelopdracht 2.6. Zout- en slibverdeling Deurganckdok en frame metingen 17/3/2006 - 23/5/2006
International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2007). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelopdracht 2.6. Zout- en slibverdeling Deurganckdok en frame metingen 17/3/2006 - 23/5/2006. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 37 + bijlagen pp.
| |
Available in | Authors |
|
Document types: Final report; Project report
|
Keywords |
Acquisition > Data acquisition Data analysis Distribution Gradients > Salinity gradients Hydraulics and sediment > Hydrodynamics > Current velocities and patterns Hydraulics and sediment > Hydrodynamics > Density currents Hydraulics and sediment > Sediment > Cohesive sediment In-situ measurements Measurement Sedimentation Sediments > Clastics > Silt Siltation Transport > Sediment transport Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions] Brackish water |
Project | Top | Authors |
- Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing, more
|
Authors | | Top |
- International Marine and Dredging Consultants, more
- WL | Delft Hydraulics, more
- GEMS International, more
|
- Vanlede, J., revisor, more
- Plancke, Y., revisor, more
|
|
|