Criteria for the backfilling of excavated trenches for immersed tunnels and pipelines
Kuik, L.J.; Groot, J.M. (1987). Criteria for the backfilling of excavated trenches for immersed tunnels and pipelines, in: CEDA dredging days 1987: proceedings. pp. 1-19
In: (1987). CEDA dredging days 1987: proceedings. Central Dredging Association: Delft. different pagination pp., more
|