IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps | Infrastructure
[ report an error in this record ]basket (0): add | show Print this page

Dredging for immersed tunnels: the designer's and main contractor's view point
Rasmussen, N.S. (1987). Dredging for immersed tunnels: the designer's and main contractor's view point, in: CEDA dredging days 1987: proceedings. pp. 1-10
In: (1987). CEDA dredging days 1987: proceedings. Central Dredging Association: Delft. different pagination pp., more

Available in  Author 
Document type: Conference paper

Author  Top 
  • Rasmussen, N.S.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Author