IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ] Print this page

Pilot study in preparation of the spatial implementation of the EU Habitat and Bird directives in general and the conservation objectives in particular for parts ... on the Left bank of the Schelde

Period: February 2004 till September 2004
Status: Completed
 Institute 

Institute  Top 
  • Universiteit Antwerpen; Faculteit Wetenschappen; Departement Biologie; Onderzoeksgroep Ecosysteembeheer (ECOBE), more, partner

Abstract
According to article 6 of the habitat directive, the individual member states are obligated to ensure that the habitat types and species for which special protection areas (SAP's and SAC's) were designated are being preserved and restored. The instruments to do this, conservation measures, can freely be adopted by every member state. Before the conservation measures can be described, conservation objectives and targets have to be determined. This project will further develop the conservation objectives for special protection sites (EU Bird directive 79/409/EEG and Habitat directive 92/43/EEG) in the Seaport of Antwerp reported by Van Hove, Nijssen & Meire (2004). We will also develop a scientific basis for the spatial implementation for the conservation objectives and conservation measures.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Institute