Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control
Vanhoucke, M. (2012). Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control. Springer Berlin Heidelberg: [s.l.]. ISBN 978-3-642-25174-0. 310 pp. http://dx.doi.org/10.1007/978-3-642-25175-7
Vanhoucke, M. (2012). The Westerschelde Tunnel project, in: Vanhoucke, M. Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control. pp. 173-183. http://dx.doi.org/10.1007/978-3-642-25175-7_9, more
All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy