IMIS

Publications | Institutes | Persons | Datasets | Projects | Maps
[ report an error in this record ]basket (0): add | show Print this page

Complex project: Extra containerbehandelingscapaciteit in het havengebied Antwerpen: deelrapport 3. Geïntegreerd onderzoek – deel nautica: simulatiestudie voor emergencies ter hoogte van Duplexdok en Deurganckdok
Eloot, K.; Verwilligen, J. (2023). Complex project: Extra containerbehandelingscapaciteit in het havengebied Antwerpen: deelrapport 3. Geïntegreerd onderzoek – deel nautica: simulatiestudie voor emergencies ter hoogte van Duplexdok en Deurganckdok. Version 5.0. FH reports, 21_043_3. Flanders Hydraulics: Antwerp. VII, 38 + 44 p.app. pp. https://dx.doi.org/10.48607/167
Part of: FH reports. Flanders Hydraulics: Antwerp. , more
Complex project: Extra containerbehandelingscapaciteit in het havengebied Antwerpen: deelrapport 3. Geïntegreerd onderzoek – deel nautica: simulatiestudie voor emergencies ter hoogte van Duplexdok en Deurganckdok

Available in  Authors 
Document type: Project report

Keywords
    Accessibility
    Emergencies
    Harbours and waterways > Manoeuvring behaviour > Bank effects
    Harbours and waterways > Ship motion > Fairway and harbour design
    Simulations
    Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
Author keywords
    ULCS; Realtime simulaties; Duplexdok

Project Top | Authors 
  • Complex project Extra containerbehandelingscapaciteit Antwerpen: nautisch onderzoek, uitwerkingsfase, more

Contact details

Proposer: Port of Antwerp-Bruges, more


Authors  Top 

Abstract
    While the design of the Duplex dock is under further investigation and preparation, the question rose if the design (end 2022) could be evaluated based on emergencies simulations. Therefore a simulation study of two days was setup with the Flemish and Dutch pilotages and tug companies to be executed at the full mission 360 deg bridge simulator of Flanders Hydraulics. In November 2022, 17 simulation runs have be realized in diverse causes of emergencies such as wind related, tug failure or no tug and blackout emergencies. Although some simulations were characterised by grounding or collision with infrastructure or a moored ship, the majority of simulations had a successful result taken into account the circumstances.
    For the wind related emergencies wind conditions above the actually allowed limit (6 Bft for inbound, 7 Bft for outbound manoeuvres to the terminals) showed that safe manoeuvring is still possible and that the availability of different headings of the docks (Duplex and Deurganck) gives the opportunity to bring the ship bow into the wind. Some measures or further investigations are also proposed. For the tug failure emergencies the key question is if sufficient tug assistance remains for compensating wind (or current) effects. Outbound head out manoeuvres without tugs, starting in Duplex dock, were possible up to 4 Bft wind class in case of emergency with increased risk on damage (e.g. ship’s stern contact with quay at departure). One outbound blackout emergency showed that at 5 Bft wind class with two 80 tons tugs, the departure could be successful realized.
    The conclusion is that the 2022 design of Duplex dock, in connection with Deurganck dock, gives possibilities to overcome emergency situations due to different causes. Measures or investigations can still be made on fendering of the northern wall of Duplex dock at entrance, higher power of tugs (e.g. 85 tons) and remote assistance of the captain and crew by the pilotage or the availability of a PPU on the ship’s bridge

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors