Publications | Institutes | Persons | Datasets | Projects | Maps | ||||
Bridge Yzer Diksmuide: Result dimensioning bank and bottom protection [Brug IJzer Diksmuide: Resultaten dimensionering oever- en bodembescherming]
Citation
Verelst, K. (2024). Brug IJzer Diksmuide: Resultaten dimensionering oever- en bodembescherming. [Dataset] Waterbouwkundig Laboratorium. https://marineinfo.org/id/dataset/8667
Contact:
Availability: The data can be made available upon request, please use contact information.
Notes: CC BY 4.0
Description
Excel-file with results of the dimensioning of the riprap bank and bottom protection for the bridge over the Yzer at Diksmuide. Also results from dimensioning of placed blocks as erosion protection is added. moreThe Excel file is the outputfile from the Matlab routine dim_breuksteen.m for calculating the dimensions of riprap at bank and bottom. Considered hydraulic loadsare the velocity resulting from the current in the river and the velocity of main propeller and thruster of a ECMT class I ship. Output is the diameter and the mass of the needed riprap to withstand these hydraulic loads. Also a page is added with the results of the design of the placed blocks as erosion protection of the river banks under the bridge. Scope Keywords: Dimensions, Literature and desktop study, Numerical calculations, Rock, ANE, Belgium, IJzer R. Geographical coverage ANE, Belgium, IJzer R. [Marine Regions] Parameters
Diameter Dn50: Calculation mass M50: Calculation Velocity: Calculation Contributor
Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium (WL), more, data creator
Project
Aanpassing oever- en bodembescherming brug over de IJzer te Diksmuide, more
Dataset status: Completed
Release date: 2024-07-22
Metadatarecord created: 2024-10-07
Information last updated: 2024-10-07
|