[ report an error in this record ]basket (0): add | show Print this page

Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.7. Zout- en slibverdeling Deurganckdok en frame metingen 15/07/2006 - 31/10/2006
International Marine and Dredging Consultants; WL | Delft Hydraulics; GEMS International (2007). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.7. Zout- en slibverdeling Deurganckdok en frame metingen 15/07/2006 - 31/10/2006. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 36 + bijlagen pp.

Available in  Authors 
Document types: Final report; Project report

Keywords
    Acquisition > Data acquisition
    Data analysis
    Hydraulics and sediment > Hydrodynamics > Current velocities  and patterns
    Hydraulics and sediment > Hydrodynamics > Density currents
    Hydraulics and sediment > Sediment > Cohesive sediment
    In-situ measurements
    Measurement
    Sedimentation
    Siltation
    Transport > Sediment transport
    Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
    Brackish water

Project Top | Authors 
  • Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing

Authors  Top 
  • International Marine and Dredging Consultants, more
  • WL | Delft Hydraulics
  • GEMS International, more
  • Plancke, Y., revisor, more
  • Vanlede, J., revisor, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors 



Web site hosted and maintained by Flanders Marine Institute (VLIZ)
Webmaster info@vliz.be
Number of visitors: 988669 - Total hits: 6907412 (since 2006-01-17)